India’s Fast-Tracking of Hydro Projects in J&K Puts Pak on Edge

India has fast-tracked hydropower projects worth $15 billion in Kashmir in recent months, three government and state officials said, ignoring warnings from Islamabad that power stations on rivers flowing into Pakistan will disrupt water supplies.

The swift approval of projects, that had languished for years, came after Prime Minister Narendra Modi suggested last year that sharing the waterways could be conditional on Pakistan clamping down on anti-India militants that India says it shelters.

Pakistan has opposed some of these projects before, saying they violate the Indus Waters Treaty.

The schemes, the largest of which is the 1,856 MW Sawalkote plant, will take years to complete, but their approval could prove a flashpoint between India and Pakistan.

"I say the way you look at these projects, it is not purely a hydro project. Broaden it to a strategic water management, border management problem, and then you put in money," said Pradeep Kumar Pujari, the top ranking official in the power ministry.

Also Read: Chabahar & Gwadar: India and Pakistan’s Regional Power Struggle

Pakistan's foreign ministry spokesman, Nafees Zakaria, said he would confer with the Ministry of Water and Power on the proposed Indian projects, saying it was a technical matter.

He noted, however, that India would be attending a regular meeting of the Indus Commission later this month in Lahore, even though the broader peace dialogue was on hold.

Also Read: China Blocks Tributary of Brahmaputra in Tibet to Build Dam

The image is used for representational purposes. (Photo courtesy: <a href="http://india-wris.nrsc.gov.in/wrpinfo/index.php?title=Main_Page">Water Resources Information System</a>)

Triple Power

Six hydro projects in Kashmir either cleared viability tests or the more advanced environment and forest expert approvals in the last three months, two officials in India's Water Resources Ministry and the Central Electricity Authority, said separately.

Together, these projects on the Chenab river, a tributary of the Indus, would triple hydropower generation in Jammu and Kashmir from the current level of 3,000 MW – the biggest jump in decades – added the officials, declining to be named because the approvals had not yet been made public.

Pakistan's water supply is dwindling because of climate change, outdated farming techniques and an exploding population.

A 2011 report by the US Senate Committee on Foreign Relations said New Delhi could use these projects as a way to control Pakistan's supplies from the Indus, seen as its jugular vein.

India says the projects are "run-of-the-river" schemes that use the river's flow and elevation to generate electricity rather than large reservoirs, and do not contravene the treaty.

Environmental groups have questioned whether the government has followed proper procedures in fast tracking projects located in a highly seismic area.

Situation has been tense along the India-Pakistan border since the 18 September attack at an Army camp in Uri. (Photo: PTI)

Blood and Water

Modi told a meeting of government officials on the Indus treaty last year that "blood and water cannot flow together", soon after the deadly attack in Uri killed 18 Indian soldiers.

Modi's message was two-fold, Indian foreign ministry spokesman Gopal Baglay said. Terrorism had to stop and India must fully utilise the economic potential available to it within the Indus treaty.

The projects that have won technical approvals in recent months are Sawalkote, Kwar, Pakal Dul, Bursar and Kirthai I and II.

Most of the projects have been held up for at least a decade awaiting multiple clearances. Sawalkote, which was cleared by a government-constituted environment committee in January, was first given techno-economic approval in 1991.

It is now up for forest clearance from the state authorities, after which the government will finalise financing and begin construction.

Some projects like Pakal Dul were stuck in litigation, but that has been resolved, Jammu and Kashmir's Power Minister Nirmal Singh told Reuters in Srinagar. "Things are now in a position of take-off," he said.

In January, senior federal officials made a presentation on energy security to Modi in which they proposed interest subsidies and long-term loans for hydroprojects above 100 MW, according to the document seen by Reuters.

But Himanshu Thakkar, coordinator of South Asia Network on Dams, Rivers & People, said some projects had been cleared without impact assessment studies and public consultation.


The Quint
The Quint is media with intelligence. The Quint is media for mobile consumption – quickly, visually and socially. The Quint is popular, digital journalism.

Share the Article :